Markets.
Water/Waste Management.
Treatment Plants.
Avra Valley Wastewater Treatment Plant
Tucson, AZ
Project Info
2006/07
$3.3 M
90%
Self-performed
Demo existing RAS/WAS flow meter vaults, modifications to the existing headworks and equalization basins, install new aerators, pumps, anoxic tanks, MLSS recycle pump station, junction box, meter station, flow diversion structure and flow metering, control vaults, electrical and instrumentation, all associated piping, supports and appurtenances.