Markets. Transportation. Urban Highway.

River Road: Campbell Avenue to Dodge Boulevard - Alvernon Way: Dodge Boulevard to Ft. Lowell
Tucson, AZ

Project Info
2005/07
$18.8 M
85% Self-performed
Roadway improvements: widen 2 miles of River Road to a five lane roadway with a center turn lane and two travel lanes in each direction incorporating two new intersections with traffic lighting and signalization, numerous artistic features and landscaping to maintain the rural setting within this road is situation. Construct Alvernon Way into a five lane roadway with a four span, 480' precast girder bridge over the Rillito River, traffic signalization and lighting. This project incorporated landscaping, pathways and artistic features to connect the roadway to the existing river park.