Markets.
        Drainage/Bank Protection.
        
    
    
    
        
            Arroyo Chico Drainage Improvement  (Alvernon Way to Rosemont Blvd.)
        
            Tucson, AZ
        
        
        
            
                
                    Project Info
                
                    
                        2005/06
                
                    
                        $5.3 M
                
                    
                        93%
                        Self-performed
                
                    Drainage improvements including relocation of major utilities to allow installation of a 2500 foot three-barrel precast concrete box culvert down the middle of an inner city neighborhood street from Alvernon to Columbus.