Project Info
2004/05
$11.0 M
82%
Self-performed
Construction of Pusch View Lane from Oracle Road to Lambert Lane including a new 800’ long x 96’ wide six span precast girder bridge. This project entailed earthwork retaining walls, installation of soil cement bank protection, a storm drain system, curb, sidewalk and numerous artistic features.
Widen First Avenue from Oracle Road to Lambert Lane including a new 700’ long x 46’ wide six span precast girder bridge. Project entailed earthwork, installation of soil cement bank protection, curb, sidewalk, installation of barrier wall on existing bridge and numerous artistic features.